Our Process

Eight stages. No surprisesin any of them.

Building a home is not complicated. It is just long, and full of decisions. Here is every stage, what happens in it, what it costs and roughly how long it takes.

01

Conversation

An unhurried hour with us. Your site, your brief, your budget and your timing. We tell you honestly whether we are the right builder, and if we are not, who might be.

Duration
1 meeting
Cost
Free
You receive
An indicative cost range and an honest view of feasibility
02

Site & feasibility

Site inspection, title and overlay check, orientation study, slope and access assessment, preliminary budget.

Duration
1 to 2 weeks
Cost
Free
You receive
A written site assessment and a refined budget range
03

Concept design

We sign a Preliminary Design Agreement and put the first concept on paper: site plan, floor plans, elevations, and a 3D view.

Duration
4 to 6 weeks
Cost
Design fee, credited to your build
You receive
Concept drawings, 3D visualisation and a costed estimate
04

Design development & selections

The plan is resolved with you until it is right. Structural engineering, soil report and energy assessment are commissioned. Interior selections begin.

Duration
6 to 8 weeks
Cost
Included; consultant costs itemised
You receive
Developed drawings, engineering, energy rating, selections schedule
05

Fixed-price contract

A complete specification is priced and a fixed sum agreed. We walk you through every allowance and provisional sum before you sign.

Duration
3 to 4 weeks
Cost
Contract deposit
You receive
A signed HIA fixed-price contract and a full specification
06

Approvals

Development Application lodged through PlanSA. Planning Consent, then Building Consent, then Development Approval. Building indemnity insurance taken out.

Duration
8 to 16 weeks
Cost
Council and certifier fees, at cost
You receive
Development Approval and your certificate of insurance
07

Construction

Site set-out, footings, frame, roof, lock-up, fit-out, finishes. Weekly photographs, a live program and fortnightly calls. Site meetings at frame and at fit-out.

Duration
10 to 14 months
Cost
Progress claims at defined stages
You receive
Weekly updates, portal access, and stage inspections you attend
08

Handover & aftercare

Practical completion inspection, walkthrough, keys, manuals and warranties. Then a 12-month defects period with inspections at three and eleven months.

Duration
Handover + 12 months
Cost
Final payment at handover
You receive
Keys, a handover pack, statutory warranty and scheduled aftercare

Durations are typical for a Sakar home and confirmed for your project at stage 02. Approvals in a Historic or Character Area, or where a significant tree is involved, can run longer.

Your part

Four things, and only four.

01

A brief, however rough

A list, a Pinterest board, or a sentence about how you want a Sunday morning to feel. All of them work.

02

A realistic budget

Told to us early. A budget shared at the start is a design constraint; a budget revealed at the end is a disappointment.

03

Decisions, roughly on time

We give you a schedule of when each selection is needed, with plenty of notice. The program depends on it.

04

Your honest reaction

If you do not like something we have drawn, the cheapest possible moment to say so is now.

  • Licensed SA building contractor, BLD 360325
  • Building indemnity insurance on every project
  • Fixed-price HIA contracts
  • 7-star energy performance as standard
  • 12-month defects period & statutory warranty
Black-clad contemporary home glowing with warm light at night

Start the conversation

Stage 01 is an hour, and it is free.

Every Sakar home begins with an unhurried conversation about your site, your budget and how you actually want to live. No obligation, no sales pitch, just a clear view of what is possible.